3. Following rig positioning, travel the casing into the bottom. Push steel casing into a least a depth of one m beneath the bottom amount to take lateral hundreds and movements at site. The metal casing also overcome challenges resulting from groundwater all through piling. Where applicable, the paper considers https://cast-in-situ-piles36777.pointblog.net/the-best-side-of-cast-in-situ-piles-75494358