A lot of offshore wind farms and interconnectors are envisioned for being manufactured inside the North Sea location above the approaching decades, building significant chances for the deployment of integrated network alternatives. This paper provides a multiyear distribution network organizing optimization model for running the operation and ability of distribution https://pudjianto-gondosasmito51593.develop-blog.com/39316014/little-known-facts-about-pudjianto-gondosasmito