The main park provides a capability of 200 MW while Sandrini II includes a ability of 100 MW. The overall cost of each initiatives weren't disclosed however, through design, in excess of 200 personnel ended up utilized. The initiatives are envisioned to check out A few positions opening up for https://teslasolarfresnoca.blogspot.com/2024/09/what-you-must-do-before-solar-roofing.html